Some hose work can wait for a plan, and that is the work RHPL is set up for. A planned shutdown, a component exchange on a haul truck, a shovel rebuild or a mill relining window is scheduled long before it starts. The hoses for that window can be specified, built, tested and tagged in advance. They then arrive as one checked set instead of dozens of separate counter purchases on the day.
What we do not do: we do not offer breakdown or call-out supply in South Africa. A hose that bursts today needs a local hose shop today. This page is about the other kind of work.
Why plan hoses separately from the shutdown
- Shutdown hours are expensive. Waiting for a missing item or repeating a measurement can disrupt the planned work.
- "Same as old" fails under pressure. When hoses are made on the day from the old one, length and orientation errors are repeated. A confirmed list gives the buyer a chance to check lengths and orientations before manufacture.
Shutdown types we build for
| Shutdown or event | Typical hose scope |
|---|---|
| Haul-truck component exchange (hoist, steering, final drive) | Hoses on the exchanged component and those disturbed by removal |
| Shovel or excavator major service | Boom, stick, bucket and swing hoses; pump-to-valve lines |
| Dozer or grader rebuild | Full machine hose set, cooler lines, ripper and blade circuits |
| Blast-hole drill overhaul | Mast, feed, rotation and levelling hoses; air and water lines |
| Plant shutdown (crusher, mill, roller press, kiln) | Hydraulic power-pack hoses, cylinder hoses, lubrication lines, industrial hoses |
| Smelter furnace reline | Electrode-column and tapping hydraulics with heat sleeves |
The planning sequence
- Freeze the scope early. Your planners send the machine list, serial numbers and positions due. We reply with questions for anything unclear.
- Confirm each position. References are checked one by one: hose class, ends, length, orientation, sleeve and tag wording.
- Agree dates in writing. The written quotation states the delivery terms. If the shutdown date leaves too little time, we say so before you order rather than after.
- Build, test and tag. Every assembly is pressure-tested and tagged with your position name and an RHPL trace number.
- Pack in fitting order. Assemblies are grouped by machine and circuit, in the order your crew will fit them, with a tag-to-position list.
- After the shutdown. The tags become your reorder references. Next time, the list already exists.
Who can request shutdown kits
- Mine maintenance planners, directly or through their approved South African vendor.
- Contract miners and rebuild contractors that own or maintain fleets.
- South African hose workshops and supply companies that take on the shutdown scope and want a manufactured kit behind them. See local supply partnership.
Machine names on this page describe applications such as rigid haul trucks, face shovels, dozers and drills from makers like Caterpillar, Komatsu, Hitachi and Liebherr.
*Aftermarket assemblies built to the confirmed reference. Not OEM-genuine parts; no OEM approval is claimed.*
Public operating context
[FACT] A July 2026 operating report records plant maintenance coinciding with a logistics shutdown. This is a specific reported event, not a rule that all mine shutdowns follow rail maintenance. Public report.